1 September 2004
Work in Progress at The Terraces

Click for enlargement

T1 from rear

Click for enlargement

T2 from rear

Click for enlargement

T1 underside of roof

Click for enlargement

T2 plumbing and electrical rough in

Click for enlargement

T1 soaker gutter under highlight windows

Click for enlargement

T2 external view of steel frame around
bedhead niche feature to rear bedroom

 

Click for enlargement

T2 looking up through framing of light well

Click for enlargement

T1 & T2 front as viewed from first floor
level across the road

Click for enlargement

T1 and T2 from rear

The Terraces Work in Progress
2 September 2004

Click for enlargement

T1 roof

 

Click for enlargement

T1 roof in foreground, T2 roof at rear

Click for enlargement

T1 soaker gutter under highlight windows

Click for enlargement

T2 bedhead niche feature frame
prior to fixing in steel frame

Click for enlargement

T1 framing under ridgeline roof gutter

 

Click for enlargement

Channel 7 Today Tonight filming at
The Terraces

The Terraces
8 September 2004

Click for enlargement

T1 state of the underside of the existing verandah roof

Click for enlargement

T2 architects inspecting framing

Click for enlargement

T1 electrical rough in to first floor

Click for enlargement

T2 plumbing rough in to bathroom

Click for enlargement

T1 electrical and plumbing rough in to kitchen rear wall

Click for enlargement

T1 and T2 from rear - western view

The Terraces
14 September 2004

Click for enlargement

T1 structured wiring control panel and wiring

Click for enlargement

T2 windows and doors to lightwell

 

Click for enlargement

T2 full height window from bedroom to lightwell

 

Click for enlargement

T2 external east side

The Terraces
22 September 2004

Click for enlargement

T1 sealed plywood underside of verandah overhang

Click for enlargement

T2 bifold unglazed door to rear

Click for enlargement

T1 following along the underside of the roof
looking northwards

Click for enlargement

T2 pile of pipe insulating sleeves
for hydronic heating

 

Click for enlargement

T1 exhaust duct over laundry area

Click for enlargement

T2 rough-in of electrical, structured wiring
and heating services between floors

 

Click for enlargement

T2 hydronic heating pipework being laid
in front bedroom / study

 

Click for enlargement

T2 cabling for replacement ceiling
rose front bedroom / study

 

Click for enlargement

T2 rough-in of services kitchen wall

The Terraces
302 September 2004

Click for enlargement

T1 exposed green insulated pipes to
roof mounted solar hot water service

Click for enlargement

T2 repairs to original hard plaster walls
as part of damp proof treatment

Click for enlargement

T1 rough-in of electrical, structured wiring,
plumbing and heating services between floors

Click for enlargement

T2 plumbing rough-in to ensuite

Click for enlargement

T1 looking up from entry

Click for enlargement

T2 roof over kitchen awaiting skylight

Click for enlargement

T1 services terminate in 'service' yard

Click for enlargement

T2 bifold glazed door to rear

 

Click for enlargement

T2 electrical and plumbing rough-in

 

More on Design Reports more on Archicentre Inspections Archicentre Fact Sheets DownLoad the House Hunt eBook Archicentre Renovation and Building Cost Guide

 

® The Terraces - an Archicentre project in partnership with the Building Commission and the City of Melbourne.
All content of this website is copyright © Archicentre and Medialaunch.com.au Pty. Ltd. 2004