September 2004
Work in Progress at The Terraces
|

T1 from rear
|

T2 from rear
|

T1 underside of roof
|

T2 plumbing and electrical rough in
|

T1 soaker gutter under highlight windows
|

T2 external view of steel frame around
bedhead niche feature to rear bedroom
|
| |

T2 looking up through framing of light
well
|

T1 & T2 front as viewed from first floor
level across the road
|

T1 and T2 from rear
|
|
 
The
Terraces Work in Progress
2 September 2004
|
|

T1 roof
|

T1 roof in foreground, T2 roof at rear
|

T1 soaker gutter under highlight windows
|

T2 bedhead niche feature frame
prior to fixing in steel frame
|

T1 framing under ridgeline roof gutter
|

Channel 7 Today Tonight filming at
The Terraces
|
|
 
The Terraces
8 September 2004
|

T1 state
of the underside of the existing verandah roof
|

T2 architects inspecting framing
|

T1 electrical rough in to first
floor
|

T2 plumbing rough in to bathroom
|

T1 electrical and plumbing rough
in to kitchen rear wall
|

T1 and T2 from
rear - western view
|
|
 
The
Terraces
14 September 2004
|

T1 structured wiring control panel and
wiring
|

T2 windows and doors to lightwell
|
| |

T2 full height window from bedroom to
lightwell
|
| |

T2 external east side
|
|
 
The
Terraces
22 September 2004
|

T1 sealed plywood underside of verandah
overhang
|

T2 bifold unglazed door to rear
|

T1 following along the underside of the
roof
looking northwards
|

T2 pile
of pipe insulating sleeves
for hydronic heating
|

T1 exhaust duct over laundry area
|

T2 rough-in of electrical, structured
wiring
and heating services between floors
|
| |

T2 hydronic heating pipework being laid
in front bedroom / study
|
| |

T2 cabling for replacement ceiling
rose front bedroom / study
|
| |

T2 rough-in of services kitchen wall
|
|
 
The
Terraces
302 September 2004
|

T1 exposed green insulated pipes to
roof mounted solar hot water service
|

T2 repairs to original hard plaster walls
as part of damp proof treatment
|

T1 rough-in of electrical, structured
wiring,
plumbing and heating services between floors
|

T2 plumbing rough-in to ensuite
|

T1 looking up from entry
|

T2 roof over kitchen awaiting skylight
|

T1 services terminate in 'service' yard
|

T2 bifold glazed door to rear
|
| |

T2 electrical and plumbing rough-in
|
|
|
|