5
October 2004
The Terraces
|

T1 rear
|

T2 fixing fascia over rear bedroom
|
|

13
October 2004
Media and Industry Briefing at The Terraces
|

Geoff Norton, Director, Building
Commission
speaking at the Briefing with
Robert Caulfield, Managing
Director
Archicentre
|

Cr. Kevin Chamberlain, City of Melbourne
speaking at the Briefing
|

Robert Caulfield, Managing Director
Archicentre speaking at the Briefing
|

Guests at the Briefing
|

T1 plastering, living area looking south
|

T2 Industry Briefing
- arrow to point to future external location of water tank
and inwall insulation
|

T1 plastering, living area looking north-west
|

T2 Industry Briefing
- arrows point to double glazed windows, sealed framing,
insulated concrete slab and heavy thermal mass (concrete
slab)
|
| |

T2 stair stringers
|
| |

T2 heavily insulated kitchen wall
|
| |

T2 plastered upstairs corridor
|
| |

T2 sound insulation between floors
|
|

18
October 2004
The Terraces
|

T1 plastering rear bedroom
|

T2 view from front door
|

T1 accoustic tiles study ceiling
|

T2 view through lightwell
|

T1 partially plastered view from front
door
|

T2 view from ensuite through above entry
window
|

T1 plastering in upstairs guests' vanity
|

T2 view of stair stringers from above
|

T1 plastering living area looking north-west
|
|
|

26
October 2004
The Terraces
|

T1 rear services screen fence under construction
|

Dividing fence between rear courtyards
of T1 & T2
|

T1 laying timber floor upstairs
|

T2 rear upstairs glazing
in place
|

T1 ceiling lining under balcony
|
|
|
|
|