8
November 2004
Work in Progress at The Terraces
|

T1 services screen fence in rear yard
|

T2 flashing along existing parapet
between T2 and neighbou
|

T1 flooring laid in upstairs living area
– temporary seal to window openings
|

T2 sound insulation between floors
|
|
|

T2 kitchen wall, plastered with electrical
rough-in
|
| |

T2 view from front door
|
|
 
The
Terraces Work in Progress
17 November 2004
|
|

T1 first floor balcony
screen
|

T2 completed external cladding
|

T1 living area rear glazing frames
|

T2 framed in bath – wall linings still
to be fixed.
|

T1 shelving to WIR
|

T2 different wall linings in bathroom
– lower section for tiles, upper for paint finish
|

T1 built in joinery unit (part
complete)
to upstairs study niche
|
T2 kitchen skylight in place
|

T1 framing to rear roller door
|

T2 glazed French doors and windows
to rear bedroom
|

T1 windows to upper living area
partially fitted
|
|

T1 edge treatment of timber flooring
where
it will meet (future) tiling
|
|

T1 bedroom 1 cupboard unit
|
|

T1 door hung – bedroom 1
|
|
|
 
The
Terraces
23 November 2004
|

T1 installed bifold door to living area
|

T2 finished bed niche rear bedroom
|

T1 rendered blockwork to bathroom
|

T2 kitchen skylight
|

T1 storage cupboard with rear access
to roof space over front bedroom
|

T2 repaired hard plaster to original
walls
|

T1 part of pump mechanism to water tank
|

T2 rendered blockwork wall to corridor
|

T1 other part of pump mechanism to water
tank
|

T2 roof mounted solar hot water panel
and storage tank
|

T1 rear bifold
|
|

T1 service yard from above
|
|

T1 west highlight window installed
|
|

T1 skylight over kitchen and lightwell
to study
|
|
 
The
Terraces
29 November 2004
|

T1 rear glazing
|

T2 battens laid for timber flooring
|
| |

T2 most of the stair treads in place
|
| |

T2 new ‘remnant’ wall in living area
|
| |

T2 side boundary wall and paving base
|
| |

T2 view through living area from rear
|
| |

T2 roof mounted hot water storage tank
viewed from rear
|
|
|
|