March 2004

Facade T1
|
March 2004

Facade T2
|
|
|
|

Chris McSteen - Architect
|
Terence Nott - Architect

|
|
|
|

Hall - T1
|

Hall - T2

Coat rack in hallway -
T2
|
|
|
|

Front Room - T1
|

Front Room - T2

Paper under lino. - T2
|
|
|
|

Living - T1
|

Living - T2
|
|
|
|

Kitchen - T1
|

Kitchen - T2
|
|
|
| |
|
|

Garden - T1
|

Garden - T2
|
     |
|
10
March 2004
Media Briefing and Industry Launch at The Terraces

The
Terraces Launch
|

Robert
Caulfield, Managing Director, Archicentre
speaking at the Launch
|
    |

David
Hallett, State Manager Victoria
Archicentre
|

Sarah
McCann-Bartlett
Director, Business Development & Consumer Services
Building Commission
|
    |
|

Councillor
Kevin Chamberlin
City of Melbourne
|

Archicentre,
Building Commission,
Trades Hall Council and
City of Melbourne representatives
|
    |
|

Robert
Caulfield, Archicentre
Glenn Connley and Tania Grambau
Channel 7 Today Tonight
|

Left
to right: Brian Boyd, Trades Hall Council
Councillor Kevin Chamberlin,
City of Melbourne
Mark Anderson,
City of Melbourne
|
    |

Left
to right: Sarah McCann-Bartlett
Building Commission
Regina Bron
Archicentre
|

Left
to right: Gary Workman, Green Plumbers
Paul Crapper, Building Commission
David Hallett, Archicentre
|
    |

Left
to right: Michael Kerford, Plumbing Commissioner
Gary Workman, Green Plumbers
|

Robert
Caulfield, Archicentre
Municipal Association of Victoria
representatives
|
    |
|

Left
to right: Robert Caulfield, Archicentre
Peter Brindley RACV
Carnie Spink, Archicentre
Bruce Chisholm, Armadillo
|
|
June
2004
Work in progress at The Terraces
Demolition of the back section of the properties retaining
the street facade and two front rooms of the original structure.
There will be extensive rebuilding at the rear creating
two contemporary two storey townhouses.
|

The
Terraces original facade facing the street in Carlton
|

Back
section of The Terraces,
the original front rooms have been retained
|

The
Terraces team
Left to right: T1 Architect Chris McSteen;
Builders
Con Alateras, James Alateras; James Alateras Constructions
P/L
Regina Bron Archicentre Project Manager
T2 Builders Gavin James; G R James & Son
T2 Architect Terence Nott
|

Roof
section of The Terraces
|

Onsite
at The Terraces
|

The
Terraces Builders onsite
Left to right: T2
Architect Terence Nott
T2 Builders
Gavin James; G R James & Son
T1 Architect Chris McSteen;
T1
Builders: James Alateras;Con Alateras; James Alateras Constructions
P/L
|

Left
to right:
T1 Architect
Chris McSteen;
T1 Builders: Con Alateras, James Alateras; James Alateras
Constructions P/L
|

Left
to right: T2
Builders Gavin James; G R James & Son
T2 Architect
Terence Nott
|

T1 Architect
Chris McSteen discussing progress with
Con Alateras and James Alateras
|
|
|
|

Preparation
for the concrete slab T1
|

Foundation
footings of T1 poured
|
|

|
|
Original
floor bearers laid directly on ground
|

Forming
for the slab T2
|
Common
dividing wall front corridor between
The Terraces as seen from T1
|
Blocklaying
the common dividing wall
between The Terraces
|

T1 illegal
kitchen extension tiling laid directly
on neighbours external wall
|
Old
wallpaper revealed in T1
|
 
9
July 2004
Channel 7 Today Tonight Program filming at The Terraces
|

Channel
7 Today Tonight Program
filming at The Terraces
|

Naomi
Robson Channel 7 Today Tonight Presenter
at The Terraces with Channel 7 crew
|

Naomi
Robson interviewing
Robert Caulfield
Managing
Director Archicentre on site
|

Naomi
Robson interviewing
T2 builder
Gavin James
|

The
building site of The Terraces
|

Filming
at The Terraces
|

Naomi
Robson interviewing
T1 builder
James
Alateras
|

Filming
on site
|

The
Terraces work site
|

The
central party wall being constructed at
The Terraces
|
 
20 July 2004
Work in Progress at The Terraces
|

West
boundary wall T1
|

Common
dividing wall view from front of T2
|

Common
dividing wall view from front of T1
|

Wall
gets higher view from T2 side
|

Blockwork
scaffolding on T1 side
|

Posistrut
ceiling across the living areas of T2
|

T1
from rear
|

T1
& T2 from rear
|

T1
from rear
|

T2
from rear
|
|

T2
framing commenced
|

T2
view from front door
|
|
 
28
July 2004
Work in Progress at The Terraces - Framing
|

First
floor subframe
|

T2 framework
|

Interior
framework
|

Internal
framing to roof line
|

T1 Internal
framing
|

T2 Internal
framing
|

T2 neighbouring
boundary
|

T2 neighbouring
boundary
|
|
|

T2 neighbouring
gutter overhangs boundary
|
 
2
August 2004
Work in Progress at The Terraces
|

Framing
over front room T1
|

Posistrut
ceiling over front room T2
|

First
floor structure T1
|

First
floor structure T2
|

Rear
of T1
|

Rear
of T2
|

T1 &
T2 from rear
|
|
|
|
|