| Step 6
Tendering to Builders |
|
|
“Tendering” is the
phrase used to find a builder. Before your architect approaches
a builder they need to prepare a set of tender documents
so the builder knows exactly what they are quoting on.
Our architect prepared tender documents
which included: a ‘specification’ which documents
all the fittings, finishes and inclusions; construction
drawings and schedules which detail the design of the building,
structural drawings which detail the engineering elements,
hydraulic design drawings which detail the water management
system, pool design drawings and landscaping design drawing.
In the case of Mosman Green the specification was some
64 pages of detailed information including a finishes schedule
to ensure that the tendering builders knew exactly what
to quote on.
A tip when it comes to paying for
a good set of tender documents, ‘you pay for what you get’.
Often cost blowouts with projects come during the construction
phase where the originals documentation was poor in its detail
allowing the builder to put their interpretation on the inclusions,
quality of finishes etc.
So with a good set of documents we approached the Master
Builders Association for names of builders who might be appropriate
tenders. We also passed the word around our Architects as
to builders with whom they have had a positive experience.
Word of mouth is often a good way of connecting with appropriate
builders clients who have had a positive experience can be
a strong recommendation.
In the end four builders picked up tender documents with
another four who were interested to tender but would not
be able to obtain sufficient insurance to cover the project.
Two builders submitted prices within 15% each other at
the end of November 2004 and after reviewing the type of
building operation they ran and the quality of their work
we chose the builder we believed would be more suitable.
In this case it was Brownies Constructions.
Checking the quality of a builder’s
previous work, track record, current licence and insurance
status is essential before considering their engagement.
The next step was to negotiate
the price with the builder.
|