May 2005
Brick piers and walls laid
Boral split faced blocks laid
Old roof removed
New larger openings for doors and windows
Location of floor joists and bearers
Leveling of joists and bearers
Roof framing in place
Pool excavation starts
Builder and Architect site meeting
Plumbing and formwork in place
Pool form work and steel reinforcing
Pool ready for casting
Concrete for strip footings
Upper floor framing complete
Installing pool plumbing
Pool concrete spraying
Pool taking shape
Structural steel in place
Controlling concrete drying for pool
Pool forming complete
Water tank base and walls in place